In each project, our company guarantees the following commitments to Party A:
1. Equipment installation service
1) The company sends competent and experienced technical personnel to Party A's site for installation, commissioning or guidance of equipment installation, commissioning, assessment, acceptance, training, etc.
2) The company is responsible for handling the equipment installation problems belonging to Party B's equipment.
3) The company is responsible for organizing the supporting manufacturers to participate in the commissioning.
2 The company is responsible for the technical guidance of equipment installation and equipment debugging, and Party A arranges relevant personnel to cooperate.
3 After the installation and commissioning of the equipment, the company will train Party A's technical personnel and operation and maintenance personnel in mechanical, electrical and hydraulic aspects. The content includes the composition, structure, maintenance and operation precautions of mechanical equipment, the principle of electrical system, operating procedures, maintenance points, etc., the principle of hydraulic system, maintenance points, etc.
4. During the quality assurance period of the equipment, if there is a failure during the use of the equipment, the company will reply within 12 hours after receiving the notice from Party A, and arrive at the site of Party A's users within 48 hours to fully assist the users in eliminating the obstacles.
Service concept
Cherish the customer's trust, the more customer expectations, win customer trust
Customer Witness
| ◆ Linzhou Fengbao Pipe Industry Co., Ltd. | ◆ Fujian Zhangzhou Jia Nian Steel Co., Ltd. | ◆ Xishan Coal Power Dehui Industrial Co., Ltd. |
| ◆ Hebei Kuancheng Sublimation Pressure Vessel Co., Ltd. | ◆ Jiangyin Changjiang Seamless Steel Pipe General Factory | ◆ Shandong Liaocheng Shenhao Metal Products Co., Ltd. |
| ◆ Shandong Zhongzheng Steel Pipe Manufacturing Co., Ltd | ◆ Liaocheng Jingxin Seamless Pipe Manufacturing Co., Ltd. | ◆ Hebei Huike Seamless Steel Pipe Factory |
| ◆ Tianjin Seamless Steel Pipe Factory | ◆ Shandong Zhongde Metal Material Co., Ltd. | ◆ Zhejiang Haiyan Sentai Seamless Steel Pipe Factory |
| ◆ Chenggang Chengdu Pan Seamless Steel Pipe Factory | ◆ Hebei Jiayuan Tiancheng Seamless Steel Pipe Factory | Liaocheng Xinpeng Group Seamless Steel Pipe Factory |
| ◆ Hualing Group Hengyang Seamless Steel Pipe Factory |
Contact Us
Address: 5th Floor, West Side of Longtou Apartment, Xinghua West Street, Wanbailin District, Taiyuan, Shanxi, China
Telephone:+86-351-6382700
Fax:+86-351-6382209
E-mail:tyqhjd@163.com